# Can Whole and Split Green Lentils Use the Same Defect Schedule?

By [Zenith Eclipse Co](https://paragraph.com/@admin-062e), 2026-11-09

green lentils, products, quality specifications, procurement

---

A defect schedule that works for whole green lentils can become confusing when applied to shelled-whole or split product. A separated half is an intended piece in split lentils, but it may be counted as a split or broken component in a contract for whole lentils. Seed-coat residue matters differently after dehulling than it does when the buyer orders whole seed-coat-on material.

Buyers should define the supplied form first, then write defect categories that distinguish intended product from unwanted material. This makes offers comparable and gives the supplier, inspector and receiver the same acceptance language.

Fix the product form before setting limits
------------------------------------------

Zenith Eclipse’s [green lentils supply page](https://zenitheclipse.com/green-lentils-supplier-exporter/) separates whole, shelled-whole and split presentations. It also treats size basis, appearance, quality limits, packing and destination requirements as distinct quotation fields. The written offer should therefore name the physical form rather than relying on “green lentils” alone.

Whole lentils retain the seed coat. Shelled-whole lentils have the seed coat removed while the cotyledons remain joined. Split lentils are dehulled and separated into intended halves. Each form requires its own definitions for sound product, damaged material, fragments, fines and residual seed coat.

Write a reference description of acceptable product
---------------------------------------------------

Begin the quality schedule with a short positive description. State the expected form, commercial type, cotyledon or seed-coat appearance, size basis and intended use. An inspector should be able to identify what belongs in the accepted product fraction before assigning anything to a defect category.

Then define the categories used for deductions or acceptance. A practical schedule may address:

*   foreign material and any separately controlled stones or hazardous extraneous matter;
    
*   contrasting types or colours where relevant to the buyer’s use;
    
*   damaged, mould-affected, heated, stained or otherwise unacceptable kernels under the agreed definitions;
    
*   insect-damaged or infested material and the applicable inspection scope;
    
*   splits, broken pieces and fines, each defined for the contracted presentation;
    
*   peeled or seed-coat-affected pieces in a whole-lentil contract;
    
*   residual hull or seed coat in a dehulled product;
    
*   sound material outside the contracted size band; and
    
*   moisture, purity and other analytical requirements reported separately from visual defects.
    

Avoid a catch-all category that combines several conditions with different causes and remedies. Excess fines may call for screening, while discolouration or foreign material requires a different investigation. Separate fields make the result more actionable.

Do not count intended split halves as damage
--------------------------------------------

For a whole-lentil order, the contract may limit split or broken kernels because the buyer expects intact seeds. For a split-lentil order, separated halves are the intended product. The relevant integrity question becomes how much of the material consists of acceptable halves versus smaller fragments, chips and fines.

Shelled-whole lentils need another distinction. Joined cotyledons are intended; separated halves and broken pieces may be limited. Residual seed coat should be measured under an agreed definition, but the exposed cotyledon itself is not a peeled defect—the dehulling step created the ordered form.

Keep size distribution separate from defects
--------------------------------------------

A sound small whole lentil can fall outside a buyer’s preferred screen band without being damaged. A broken piece can also pass the same lower screen. Reporting both as undersize hides the commercial difference.

Use a size table for sound product distribution and separate defect fields for splits, broken pieces and fines. State the sieve method, sample preparation and whether sizing occurs before or after removal of defects. The percentages should be reconcilable without counting the same material twice.

Define the measurement basis
----------------------------

A percentage has little value unless the contract states how it is calculated. Confirm whether a category is reported by mass or another agreed basis, how the test portion is prepared and whether categories are mutually exclusive or hierarchical. Identify what happens when one piece appears to meet more than one definition.

The sampling and inspection instruction should also identify the lot, sampling point, party drawing the sample, sample size, method, repeat-test rule and controlling acceptance result. If several lots are loaded, do not average them automatically unless the contract permits a defined blending and testing approach.

Test the schedule with three sample pieces
------------------------------------------

Before issuing the RFQ, ask the quality team to classify three hypothetical pieces: an intact whole seed, a clean separated half and a small chipped fragment. Under a whole-lentil specification, the half may fall into a split category. Under a split-lentil specification, the same half may be sound product. The chip may be broken material in both cases, but the applicable threshold and commercial impact can differ.

This simple exercise exposes definitions that depend on unspoken assumptions. Resolve them before suppliers quote, not after an inspection certificate reports an unexpected number.

Carry the schedule into packing and receiving
---------------------------------------------

Link the approved form and defect schedule to the lot, bag marks, packing list and certificate. Receiving staff should know which presentation they are checking and which document revision applies. If repacking or processing changes the form after purchase, record the new product identity rather than continuing to use the original defect schedule.

For a comparable green lentil enquiry, provide the physical form, intended use, size method, defect definitions and limits, sampling and inspection basis, quantity, packaging, destination and shipment window. Product enquiries can be sent to sales@zenitheclipse.com.

One generic defect table is convenient, but it can misclassify the product the buyer intentionally ordered. A form-specific schedule protects the commercial meaning of whole, shelled-whole and split green lentils from quotation through receiving.

---

*Originally published on [Zenith Eclipse Co](https://paragraph.com/@admin-062e/green-lentil-whole-split-defect-schedule)*