# Metro

By [baranewown](https://paragraph.com/@baranewown) · 2021-10-29

---

### Construction of Harbin Metro started on 5 December 2006. The total investment for the first phase of Line 1 is RMB5.89 billion. Twenty stations were planned to be set on this 17.73 km (11.02 mi) long line starting from Harbin East Railway Station to the 2nd Affiliated Hospital of Harbin Medical University in the west of the city. A metro depot, a command centre and two transformer substations will be built along the line. Most of the line's route follows the air defence evacuation tunnel left from the "7381" Project which started in 1973 and ended in 1979. The 7381 project was intended to protect Harbin from the former Soviet Union's possible invasion or nuclear attack.

### Yidaeryuan (2nd Affiliated Hospital of Harbin Medical University) Station, interchange station between Line 1 and Line 3.

### The Line 1 of Harbin Metro opened on 26 September 2013.\[citation needed\] It is oriented along the east–west axis of the urban area of Harbin: from north-east (Harbin East Railway Station) to south-west (2nd Affiliated Hospital of Harbin Medical University).\[167\] Line 2 and Line 3 are under construction. Line 2 runs from Songbei District to Xiangfang District and ringlike Line 3 runs through Daoli, Daowai, Nangang and Xiangfang Districts of Harbin. On 26 January 2017, Phase I of Line 3 opened for public service. Line 3 links Harbin West Railway Station to Yidaeryuan Station, the transfer station between Line 1 and Line 3.\[168\] In the long term, the city plans to build nine radiating metro lines and a circle line in downtown and some suburban districts, which account for 340 km (211.3 mi) by 2025.\[169\]

---

*Originally published on [baranewown](https://paragraph.com/@baranewown/metro)*
