# Construction update: Junction House

By [Brandon Donnelly](https://paragraph.com/@brandondonnelly), 2022-03-10

2720-dundas-street-west, concrete-piles, construction, development, dundas-street-west, fly-forms, junction-house-condos, mid-rise-building, the-junction, toronto

---

![](https://storage.googleapis.com/papyrus_images/3c4bf643ea00ef58b88d4019dc9af347.jpg)

This is a photo of [Junction House](https://www.junctionhouse.ca/) that I took this morning after our weekly construction meeting. The team is currently preparing for the first concrete pour of level 4 (each floor has been split up into three pours). We're now [flying our forms](https://skyrisecities.com/news/2015/12/explainer-fly-forms), which means that we're able to move a lot faster. This is the exciting part of a new build mid-rise like Junction House. The underground garage part is like watching paint dry.

We're scheduled to be topped out by this summer, so expect some gratuitous view photos [on the socials](https://linktr.ee/brandondonnelly).

---

*Originally published on [Brandon Donnelly](https://paragraph.com/@brandondonnelly/construction-update-junction-house)*
