# Housing on the Line

By [Brandon Donnelly](https://paragraph.com/@brandondonnelly), 2026-09-16

architecture, toronto, architecture, design, housing, superkul, toronto, transit, transit-oriented development

---

![](https://storage.googleapis.com/papyrus_images/02c4a684c69364dce1afb6edbf9a3a8e071c1efc94db8b2571bf53c2ab562be1.jpg)

![](https://storage.googleapis.com/papyrus_images/701dc25e870b134c61c81a1635a1356ca21fc80ee1dc91cf3062c08d1f823494.jpg)

![](https://storage.googleapis.com/papyrus_images/57a2b415a938e3d744a58c9568675f3bb7e08d26a8124bb2c73d07ae231abbb9.jpg)

![](https://storage.googleapis.com/papyrus_images/3a2ad89a5e78b28877809666d046f27d3e65f8852f3f2b15c9ec6f9e96f890b3.jpg)

One of the fundamental truths about cities is that transportation and land-use planning are integral to one another. The most successful cities understand this and build density on top of transit, and build transit where density can and will go. See, once again, [the Tokyo model](https://brandondonnelly.com/rail-oriented-development-in-tokyo/). It’s for this reason that I think the Superkül-led conceptual project called _Housing on the Line_ is an important one for Toronto. While the projects are speculative, they remind us that many of our transit stations are severely undeveloped, including ones we’ve only recently built. Why?

Description:

_Housing on the Line_, a conceptual project and architectural exhibition conceived and initiated by Superkül, will open to the public next Thursday, September 24th in Liberty Village. Developed in collaboration with six other firms – COMN Architects, Dubbeldam Architecture + Design, Gabriel Fain Architects, StudioAC, Studio VAARO, and Suulin – the project proposes speculative designs that integrate multi-unit residential buildings with smaller existing subway station sites along TTC Line 2 Bloor-Danforth. Each firm’s proposal treats a different subway station along Line 2 as a creative canvas for imagining innovative typologies and context-appropriate design that delivers human-scale character, enhanced amenities, and community connectivity.

Details:

Housing on the Line | Opening Reception  
Date: Thursday, September 24, 2026  
Time: 6:00–9:30 pm  
Location: The Bakery, 2 Fraser Ave, Toronto  
RSVP: adele@superkul.ca

If you can’t make the opening reception next Thursday, you can also visit between September 25-27, during the hours of 10am-5pm.

* * *

_Project credits (in order):_ [_Superkül_](https://www.superkul.ca)_,_ [_Studio VAARO_](https://studiovaaro.com)_,_ [_Gabriel Fain Architects_](https://www.gabrielfain.com)_,_ [_Dubbeldam Architecture + Design_](https://dubbeldam.ca)

_Image credits: All renderings by Aron Lorincz Ateliers_

---

*Originally published on [Brandon Donnelly](https://paragraph.com/@brandondonnelly/housing-on-the-line)*
