# National preventive response phase IV

By [Katherine1](https://paragraph.com/@katherine1) · 2023-06-05

---

On the evening of 6 May, Red Star journalists learned from the Ministry of Emergency Management that, since 3 May, there has been a process of intense rainfall in the central region of Jiang West, which has suffered from heavy rains in the cities of the spring, Kayin and Gian. On 6 May, at 0700 hours, there was a critical incident at the dawn dyes in the hill stream in the city of Phongon. In the light of the current situation in the area of preparedness and response to the national drought preparedness and response, on 6 May, the national defence team launched the fourth emergency response, sending a working group and expert group to provide on-site guidance to rescue operations.

United Nations Voluntary Fund for Victims of Torture

It is known that the Minister of the National Deputy General Command, Emergency Management and Emergency Management took the first time to demand the timely transfer of threatened populations in the Province of Jiangxi, and to take effective measures to avoid increased risk and ensure the safety of personnel and vital infrastructure. The Deputy Minister for Emergency Management and the Deputy Minister for Water Affairs, the Crown Prince, presided over the afternoon of 6 May a special video conference room for air defence, which worked with the Ministry of Water Resources, the Ministry of Natural Resources and the China Meteorological Agency to determine the recent weather and flood geological disaster situation, video-linked provincial defence offices in the provinces of Giang, Foca, and Grand-East, to study the deployment of anti-fouling operations, focusing on the movement of anti-fouling and flood relief.

It was noted that the current round of rainfall was intense, intense and heavily impacted, and that there would be strong rainfall in parts of the south-west of the river, eastern Fonds and north-central north-west of the country from 6 to 7 July. The meeting called on the Province of Jiangxi to organize emergency relief, strengthen critical embankments and ensure the safety of critical infrastructure, such as the Gix railways; properly house the masses to secure the lives of the people; and identify causes, cross-referencing and further embankment of the embankment.

The meeting stressed the need for all regions to improve political stationing, first place people’s safety and security, strengthen organizational leadership and ensure disaster preparedness and preparedness for flood hazards; ensure that low-lying urban areas and small- and medium-sized water reservoirs, utilities, end-of-mineers, etc.; strengthen pre-emptive monitoring mechanisms to ensure early warning and response to high-risk disasters;

IFAC journalists learned that, after reporting the risk of the Fone dykes, the local drought control command quickly organized emergency, public security, fire and town rescue teams for more than 1,000 people. The Fonang Fire Rescue Brigade deployed seven vehicles and two boats totalling 54 firefighters to the site. The Fire and Rescue Brigade of the spring mobilized 12 vehicles, 16 boats and 69 people around the area to reinforce them, actively engaged in blocking and mass transfers, as well as providing critical infrastructure protection.

Vice-Minister for Foreign Affairs

Original: ENGLISH

---

*Originally published on [Katherine1](https://paragraph.com/@katherine1/national-preventive-response-phase-iv)*
