Cover image for The 3-hour rule for high-speed rail

The 3-hour rule for high-speed rail

  • Mobility
  • Montréal
  • Toronto

I recently started following Adam Nathan’s posts about airlines, airports, and travel in general. This week he posted a comparison between taking the train and flying for 8 city pairs. The comparison looks at door-to-door time, factoring in the time it takes to travel to and from each station or airport; how long check-in, security and boarding take; and then how long you’re actually on board.

What he found was that 3 hours on board a train tends to be the magic number. Once you pass this duration, travel times tend to flip in favor of flying. The one exception seems to be London-Paris, which is only a 2.5-hour train ride, but has a longer check-in time, presumably because you’re crossing a border in and out of the EU’s Schengen Area.

I’m going to assume that the people planning Canada’s high-speed Alto train are similarly doing rigorous analyses such as these. Good case studies for us are Rome-Milan and Madrid-Barcelona. Both routes have on-board train times of about 3 hours and have a similar distance to Toronto-Montreal.

If you want to ensure that high-speed rail is a success in Canada, make it faster, cheaper, and generally better than flying. This seems to include keeping the on-board time at or below 3 hours.

Cover image for The math behind Toronto’s sixplex rollout

The math behind Toronto’s sixplex rollout

  • Development
  • Housing
  • Planning

Toronto started allowing sixplexes as-of-right across 9 wards last summer. Since then (and according to the Toronto Star), the city received 60 permit applications, more than half of which also included a garden or laneway suite (so 7 homes total). Our project at 571 Oakwood Avenue should be on the below map, but I don’t have access to the paywalled article to take a closer look:

If we assume that 30 of the applications included 7 homes and the remaining 30 only had 6 homes, that’s a total of 390 homes, most of which were permitted as-of-right for the 16-month period between June 2025 and October 2026. Annualized, let’s call this 300 homes in the first year.

What is obvious is that, for a city of 3 million people, this isn’t nearly enough. But we also know that it takes time for the market to respond to new policy changes and that we will certainly see an increase next year.

In my view, if we saw a few thousand new homes delivered this way each year, it would be a policy success. So let’s say that we need to 10x the number of homes, which would mean bringing the annual project count from ~45 to 450.

This feels doable, though it does remain to be seen how well this model will work in the inner suburbs. It’s worth noting that the one ward in Scarborough that currently permits sixplexes has yet to see an application according to this dataset.

The big barrier is likely parking. Most of these infill projects are being built with none of it, and that means they’re only really feasible from a market perspective in areas that are walkable and have acceptable levels of transit.

Even still, it’s not inconceivable to think that we could increase the annual application count to a few hundred. And this would be meaningful because it’s the most cost-effective way to deliver new infill housing. Single-family homes are obviously more expensive to build, and so too are higher-density concrete buildings.

Add in six-storey buildings along the city’s major streets, and suddenly you’ve got missing-middle housing making a real contribution to Toronto’s housing needs.

Cover image for The electrification of the global economy is here, but big bottlenecks remain

The electrification of the global economy is here, but big bottlenecks remain

  • Environment
  • China
  • Cop31

The 31st UN Climate Change Conference (also known as COP31) is currently underway in Turkey. And one of the pledges being championed is a goal to increase electricity’s share of global energy consumption from about 23% to 35% by 2035 (the tagline is “35 by 35”).

Of course, the electrification of the global economy is already underway. Here’s a fascinating chart from Bloomberg:

Seeing what China has accomplished in 25 years is extraordinary. About a third of its total energy consumption is now electricity. Here in Toronto, I can also say that on all of our new infill rental projects, we are aiming to be 100% electric and have solar panels on the roof. We’ve also been exploring photovoltaic facades, and there’s a business case to be made for it.

But the rubber does eventually meet the road somewhere, and the big challenge we are facing — one that I have blogged about before — is the high cost of new electrical services. It can be prohibitive on both small and large housing projects, where offers to connect can come with a bill that reaches into the high seven figures!

The electrification of the global economy is the right direction, but it’s going to take a concerted effort across many different stakeholders.