c. If they have messed up the whole place with the bricks, put them in Engineering. d. If they are arranging the bricks in some strange order, put them in Planning. e. If they are throwing the bricks at each other, put them in Operations. f. If they are sleeping, put them in Security. g. If they have broken the bricks into pieces, put them in Information Technology. h. If they are sitting idle, put them in Human Resources. i. If they say they have tried different combinations, they are lookin...