It is becoming real. Construction started in April 2022 in Texas, USA. Blockstream and Block have joint forces to build a 100% off-grid renewable energy bitcoin mining facility. It consists of 3.8MW of solar panels combined with 4 Tesla Megapack battery units with the capacity to store up to 12MWh of energy. Some technical details: ● The total cost of the plant is $12 million; ● Out of the 3.8MW of solar power installed, 1MW will be used to mine bitcoins and 2.8MW will be used to charge the b...