CONSTRUCTION OF TECHNICALLY & ECONOMICALLY FEASIBLE 198 KMS ROADS IN PESHAWAR DIVISION. ADP NO (1593/200247). SUBHEAD:
Mohsin
Aug 23
ORIGINAL PC-I Cost = RS 150.00 (M) · AA ISSUED ON = 22.12.2020 · LENGTH OF ROAD= 1.5 KM · CONTRACTOR NAME= M/s FINE HOME · DATE OF COMMENCEMENT= 15.06.2021 · REVISED PC-I COST= RS 775.00 (M) · REVISED AA ISSUED ON = 25.05.2021 · LENGTH OF THE ROAD= 6.2 KM · CONTRACTOR NAME= M/s DURRANI CONSTTRUCTION · DATE OF COMMENCMENT= 01.10.2021 · WIDTH OF THE ROAD= 66 FT (ROW) SCOPE OF WORK: BLACKTOP WIDTH= 48FT PCC SHOULDERS= 5FT DRAIN STRUCTURE WORK CULVERTS