As a result of separate construction work on the fourth line of the geo-coltan and on the peripheral road, the V 134 and 131 lines of the road will be temporarily adjusted. Specifically, as a result of the construction work on the fourth line of the geometry, on 28 April, a shutdown was opened at 2200 hours south of the road south of Nanjing (for a projected four-month period), when the bus was unable to reach normal. The V134 transit route was temporarily adjusted to 30 metres north of the f...